Our Services

“We value quality & deliver as promised”

Testing & Commissioning

– Protection and Control Commissioning of Substations
– Objective & Scope: The objective of the commissioning & testing is to verify the correct integration of primary & secondary Protection, Control & Metering Equipment for each Transformer, Motor & Feeder Bay, with the objective of signing each bay off as ready to be energized with primary voltage.

– Testing all Primary Equipment

  • Circuit Breakers
  • Current Transformers
  • Voltage Transformers
  • Power Transformers
  • NEC/NER/ Auxiliary Transformers
  • Surge Arrestors
 

-Proving Equipment Wiring to Design Drawings

 

  • Circuit Breakers
  • Transformer Auxiliary Wiring
  • Tap Change Drive
  • Control Panel
  • Switchgears
 

– Proving Testing all Secondary Cables

  • Continuity
  • Insulation resistance
  • Core & Cable Numbers
 

– Apply Relay Settings & Logic
– Perform Secondary injections on Relays & other secondary equipment
– Function test complete scheme

Engineering

Professional

Electrical

Electrical engineering solutions to stay compliant.